CLIENT: STUDIO PIETRANGELI
CONTRACTOR: SALINI COSTRUTTORI
OWNER: ENEL GREEN POWER
COUNTRY: SIERRA LEONE
YEAR: 2008-2009
PROJECT DESCRIPTION: 50MW Hydroelectric power plant along the Seli River in Sierra Leone. Major feature is a rockfill dam with bitouminous asphalt face 87m high and 400m long. Reservoir length 30km for a total volume of 410Mmc
GEOLOGICAL SETTING: Precambrian basement in contact with a greenstone belt. Main lithologies: gneiss and amphibolite.
Desk study
Satellite data acquistion and interpretion
Interpherometric analysis of satellite radar data for ground movement detection
Identification of existing landslides
Geological and geomorphological field survey
Lanslide hazard and risk analysis with multicriteria approach
Landslide hazard and risk zonation
Impact wave amplitude assessment
Slope stability monitoring plan