GERD HYDROELECTRIC PROJECT - ETHIOPIA

CLIENT: STUDIO PIETRANGELI

CONTRACTOR: SALINI COSTRUTTORI

OWNER: ENEL GREEN POWER

COUNTRY: ETHIOPIA

YEAR: 2011-2015

PROJECT DESCRIPTION: 6000MW Hydroelectric power plant along the Blue Nile River in Ethiopia. Major features are the RCC Main Dam 155m high and 1780m long and the Rockfill Saddle Dam 50m high and 5000m long

GEOLOGICAL SETTING: Precambrian rocks of the Arabian Nubian shield constituted by gneiss, schists and marls intruded by pegmatite and basalt dykes.

  • MAIN DAM BASIC DESIGN

    Support to the design of site investigations

    Geostructural surveys with close range photogrammetry

    Review of site investigation data

    Geodatabase and statistical analysis of SI results

    3D Geological, hydrogeological and geotechnical reference model

    Geotechnical characterization of dam and spillway foundations

    Geotechnical assessment of foundation joints

    Hydrogeological study and monitoring plan

    Meeting with the International Panel of Experts

    On site visits during foundation excavation