AYANUNGA HYDROELECTRIC PROJECT - PERU'

CLIENT: LOMBARDI LATINOAMERICA S.A.

OWNER: ENEL GREEN POWER

COUNTRY: PERU'

YEAR: 2016- in progress

PROJECT DESCRIPTION: 40MW Hydroelectric power plant along the Anayunga River in Peru'. Major features are 2 Tyrolean type intakes and 2 headrace channels of 4.0km and 2.6km.

GEOLOGICAL SETTING: Metamorphic basement of the Marañón Complex constituted by schists, slates and fillites.

  • BASIC DESIGN

    Review of previous site investigations and geological studies

    Geomorphological and structural mapping from lidar and satellite data

    Geological and geomorphological mapping

    Geostructural surveys

    Additional site investigation plan

    Support to site investigation managment and control

    Geodatabase and statistical analysis of SI results

    Geological risk assessment

    Geological reference model