  • 2020 CHIVOR HYDROELECTRIC PROJECT (1000MW) - COLOMBIA

    Geotechnical assessment for power tunnel lining refurbishment

  • 2019-2020 BABA HPP (42MW) - ECUADOR

    Post-earthquake assessment of dam integrity - Geotechnical expert

  • 2019-2020 DAULE PERIPA (213MW) - ECUADOR

    Post-earthquake assessment of dam integrity - Geotechnical expert

  • 2019-2020 ARAKOT HPP (80MW) - INDIA

    Geological and geotechnical study for detailed design

  • 2019-2020 POMACOCHA DAM - LIMA WATER SUPPLY SYSTEM - PERU'

    Geological, hydrogeological and geotechnical risk assessment

  • 2019-2020 NIMPANA HPP (18MW) - PERU'

    Due diligence of the geological and geotechnical conditions

  • 2019-2020 TOQUEPALA MINE DIKE DC4 - PERU'

    Field survey, site investigation plan, geological and geotechnical study, debris flow risk assessment for detailed design

  • 2019-2020 PICACHO WATER STORAGE RESERVOIRS - HONDURAS

    Geological assessment for tender

  • 2019-2020 SAN JOSE' WATER STORAGE RESERVOIRS - HONDURAS

    Geological assessment for tender

  • 2019 EL TORNILLITO POWER PLANT (200MW) - HONDURAS

    Geological assessment for Due Diligence

  • 2019-2020 MOUNT COFFE HPP AND ST. PAUL RIVER DEVELOPMENT (600MW) - LIBERIA

    Technical Panel of Experts for Dam and Hydroelectrico Projects - Geotechnical Expert

  • 2019-2020 SEBZOR HYDROELECTRIC PROJET (10MW) - tAJIKISTAN

    World Bank Geological-Geotechnical Consultant       

  • 2019 CHIVOR HYDROELECTRIC PROJECT (11MW) - HONDURAS

    Geological assessment during construction of a new intake structure

  • 2018 PETUNCARA HYDROELECTRIC PROJECT (11MW) - HONDURAS

    Geological assessment for Due Diligence

  • 2018-2019 HUMUYA HYDROELECTRIC PROJECT (15MW) - HONDURAS

    Geological assessment for Due Diligence and Feasibility Study

  • 2018 SAN RAFAEL MINE B4 TAILIING DAM - PERU'

    Geological assessment for dam foundations

  • 2018 MAJES HYDROELECTRIC PROJECT (300MW) - PERU'

    Hydrogeological Study for detailed design

  • 2018-2019 KIMWARER MULTIPURPOSE PROJECT (20MW) - KENYA

    Geological study, site investigation plan and geotechnical characterization for detailed design

  • 2018-2020 HIDROITUANGO HYDROELECTRIC PROJECT (2400MW) - COLOMBIA

    Geological-geotechnical expertise for plant rehabilitation after flood damages, 3D modelling of the collapsed zone

  • 2018 DJURICKA 1-2 HYDROELECTRIC PROJECT (4MW) - MONTENEGRO

    Geological assessment for Due Diligence

  • 2018 CHACHAGUALA 2-3 HYDROELECTRIC PROJECT (21MW) - HONDURAS

    Geological study for feasibility and basic design

  • 2018 LA VEGONA 2 PUMP STORE PLANT (120MW) - HONDURAS

    Geological assessment, site investigation plan and geotechnical characterization for feasibility and basic design

  • 2018 MAZAR DUDAS HYDROELECTRIC PROJECT (21MW) - ECUADOR

    Geological survey, site investigation plan and geotechnical characterization for re-design of penstock and powerhouse alignment

  • 2018 ARROR MULTIPURPOSE PROJECT (60MW) - KENYA

    Geological study, site investigation plan and geotechnical characterization for detailed design

  • 2018 ABIAGUA HYDROELECTRIC PROJECT (100MW) - ECUADOR

    Geological survey for Feasibility study

  • 2017 SOLU KHOLA HYDROELECTRIC PROJECT (80MW) - NEPAL

    Geological study, site investigation plan and geotechnical characterization for detailed design

  • 2017 LOS CONDORES HYDROELECTRIC PROJECT (150MW) - CHILE

    Geological assessment during construciton

  • 2017 SAN MIGUEL I AND II HYDROELECTRIC PROJECT (40MW) - PERU'

    Geological scouting for optimization of the plant scheme

  • 2017 FRANCISCO MORAZAN (EL CAJON) HYDROELECTRIC PLANT (300MW) - HONDURAS

    Geol. Daniele Battaglia member of the Dam Security Board

  • 2017 LOS CONDORES HYDROELECTRIC PROJECT (150MW) - CHILE

    Geological assessment during construction

  • 2017 San Miguel I e II Hydroelectric Projects (40MW) - PERU

    Preliminary geological exploration for site selection

  • 2017 El Tablon Hydroelectric Project (40MW) - Honduras

    Field mapping, 3D geological model, geotechnical characterization

  • 2016-2017 Ayanunga Hydroelectric Project (20MW) - PERU

    Geological survey, site investigation plan and geotechnical characterization for basic design

  • 2016 Arenal IV Hydroelectric Project (50MW) - HONDURAS

    Preliminary geological study for Due Diligence

  • 2016 Sisi and Cresta Hydroelectric Project (10 and 8MW) - UGANDA

    Geological assessment and site investigation plan for design bidding

  • 2016 Zana II Hydroelectric Project (8MW)- PERU

    Geological mapping and study for Feasibility design

  • 2015 Grand Eweng Hydroelectric Project (1200MW)- CAMEROUN

    Site visit and geological assessment for design bidding

  • 2015 Alambi-Tulipe Hydroelectric Project (10MW)- ECUADOR

    Geological and geotechnical assessment for Feasibility design

  • 2015-2017 Arenal I and II Hydroelectric Project (50MW)- HONDURAS

    Geological mapping and site investigation plan

  • 2015 Santa Lorenza I and II Hydroelectric Project (18 and 8MW)- PERU

    Geological and geotechnical study for Feasibility design

  • 2015 Kafue Gorge Small Hydropower Station (10MW)- ZAMBIA

    Geological and geotechnical study for Feasibility design and site selection

  • 2014-2016 Santiago G8 Hydroelectric Project (3600MW)- ECUADOR

    Review and validation of the geological investigations and model

  • 2014 La Campana Hydroelectric Project (60MW) - GUATEMALA

    Geotechnical study for Feasibility design and selection of tunnel alignment

  • 2014 Jacaleapa Hydroelectric Project (15MW) - HONDURAS

    Site visit, aerial photogrammetry and site investigation plan

  • 2014 Neikovtsi Dam (Water storage) - BULGARIA

    Geological survey, site investigation plan, geological - hydrogeological model and geotechnical characterization

  • 2013 Santa Maria de Jesus Dam (25MW) - GUATEMALA

    Geological survey and risk assessment for dam security analysis

  • 2013 San Vicente Dam (Water storage) - ECUADOR

    Geotechnical advice for spillway instabilities due to slaky claystones

  • 2013-2014 El Volcan Hydroelectric Project - Dam site (26MW)- GUATEMALA

    Geological study for dam site selection, photogrammetric survey

  • 2012-2015 Santa Maria de Quipúa Dam (40MW)- Honduras

    Geological and photogrammetric survey, speleological exploration, geological model, site investigation plan, geotechnical assessment

  • 2012 Ojo de Agua Hydroelectric Project (20MW)- HONDURAS

    Geological expertize during construction

  • 2011-2015 Great Ethiopian Reinassance Dam - Main Dam e Spillway (6000MW) - ETHIOPIA

    Geostructural and photogrammetric surveys, geological and hydrogeological model, geotechnical assessment

  • 2010 Chespì - Palma Real Hydroelectric Project (450MW) - ECUADOR

    Geostructural survey, dilatometr test, borehole optical survey, geotechnical assessment, paleoseismological study of the Nanegalito Fault.

  • 2010 Ca Selva Dam (10MW) - ITALY

    Geostructural survey and wedges stability analysis

  • 2009 Yiben Hydroelectric Project (66MW) - SIERRA LEONE

    Site Investigation Plan

  • 2007 Gibe II Dam (420MW)- ETHIOPIA

    Geotechnical model review, geological risk analysis for insurance

  • 2007 Gibe III Dam (1870MW) - ETHIOPIA

    Geotechnical characterization of the dam foundations

  • 2007-2012 Somplago Hydroelectric Plant (166MW)- ITALY

    Site investigations, geological and hydrogeological model, geotechnical assessment, hydrogeological monitoring

  • 2006 Beles MPP Project (450MW)- ETHIOPIA

    Hydrogeological model and geotechnical characterization

  • 2006 Bumbuna Dam (50MW) - SIERRA LEONE

    Landslide hazard and risk assessment. Fluorescent tracer test for detection of dam leakages

  • 2005 Bomba Hydroelectric plant (58MW)- ITALY

    Geotechnical study of the dam foundation

  • 2001 Scais Hydroelectric plant (22MW) - ITALY

    Geological study for instabilities along the headrace canal

  • 2000 Ceppo Morelli Dam (22MW)- ITALY

    Geostructural survey of the dam abutments