CLIENT: AK Ingegneria geotecnica
OWNER: ANAS
CONTRACTOR: SIS scpa
COUNTRY: ITALY
YEAR: 2007-2008
PROJECT DESCRIPTION: 38km of highway renovation with construction of 34 Cut and Cover Tunnels (total 19km), 27 Tunnels (7.7km) and 56 Bridges and Overpasses (12km) between Casalbuono and Lauria
GEOLOGICAL SETTING: Carbonatic sediments and flysch units. Mayor lithologies: limestones, marls, sandstones and mudstones.
Desk study
Geomorphological and structural interpretation from satellite data
Geological, geomorphological and hydrogeological survey
Geostructural surveys
Landslides recognition also with the support of radar satellite interferometry (InSAR)
Analisis of site investigation data
Geodatabase and statistical analysis of investigation data
Geological and geotechnical reference model
Geotechnical characterization
Risk assessment of the impact on existing springs